• This email address is being protected from spambots. You need JavaScript enabled to view it.
Lightweight Fabric Roof over seating at Yarrow Stadium - West Stand
Lightweight Fabric Roof over seating at Yarrow Stadium - West Stand

APPLICATION OF PROJECT:       Stadium Roofing Canopy

PROJECT DESCRIPTION:

Yarrow Stadium in Taranaki was scheduled for a major redevelopment to comply with modern earthquake regulations and ensure the venue remained fit for purpose, aligning with the grow city’s cultural and sporting needs. Following the declaration of the west stand as earthquake-prone in 2018, we were commissioned to design, engineer, and provide a lightweight fabric roof solution that would integrate with the existing structural steel of the west grandstand, also known as the Noel & Melva Yarrow Stand. 

HighComm Large Yarrow

Field of Dreams Weather Protection to 2 Courts
Field of Dreams Weather Protection to 2 Courts

APPLICATION OF PROJECTSports Court Canopy

PROJECT DESCRIPTION:

A specialised canopy structure was commissioned for the Field of Dreams project at Oxford Falls Grammar School in New South Wales, Australia. The design aimed to provide weather protection for two competition playing courts situated on the upper level of a two-story building, covering 2,200 square metres.

In addition to the canopy made of PTFE, stainless steel mesh was incorporated around the perimeter of the open-air facility. The rated mesh effectively enclosed the area and acted as a barrier to prevent equipment from falling through and provided fall protection for users of the courts all while maintaining adequate air circulation.

View of the John Goodman Amphitheatre
View of the John Goodman Amphitheatre

ID NUMBER  2284 
ENTRY CATEGORY   2 – Medium structures
ENTRANT ROLE    Designer / Installer
PROJECT NAME: MSU John Goodman Amphitheatre 
APPLICATION:       Amphitheatre canopy 

PROJECT DESCRIPTION:

The MSU John Goodman Amphitheatre stands as a testament to innovative design meeting environmental challenges. Covering 6,792 square feet, and constructed with PVC TX30 material for durability and weather resistance, it offers exceptional acoustics and a versatile venue for concerts, plays, lectures, and cultural events, ensuring a premier outdoor experience for performers and audiences alike.

View of the new Fabric Roof covering the Bowling Greens
View of the new Fabric Roof covering the Bowling Greens

IDENTIFICATION NUMBER  3214 Hamilton Workingman’s Club Canopy

PROJECT DESCRIPTION:

Hamilton Workingmen's Club was established in 1955, and in the last two decades has experienced significant growth with more than 7000 members, to become one of the Premier Clubs in New Zealand. Infrastructure development is important to both the club and community, and over the years the club has invested in maintaining and elevating their amenities. Fabric Structures was engaged to design, fabricate, and install a new partial enclosure over the green at the Hamilton Workingmen's Club. This project aimed to provide a versatile, weather-resistant space for club members and visitors, enhancing the usability of the green throughout the year.

DESIGN / FABRICATION / INSTALLATION BRIEF

The project involved designing, engineering, and building a fabric structure over a bowling green, incorporating two walls along two sides. The remaining sides were adjacent to the clubhouse and a large concrete boundary wall, providing sufficient shelter and thus eliminating the need for additional walls on these sides. The client required that the wall running alongside the neighboring green be operable, which led to the installation of a custom curtain on this side, while the second wall remained fixed.

Whitten Oval Enclosed Facility - Interior View
Whitten Oval Enclosed Facility - Interior View

2024 LSAA Design Awards Entry #3864 Whitten Oval Project

ID NUMBER 

3864

ENTRY CATEGORY

3 Large Structures

ENTRANT ROLE

Design / Engineer / Fabrication / Installation

PROJECT NAME:

Whitten Oval Indoor Training Facility

APPLICATION:

Tensile Membrane Roof integrated into a solid-wall building.

 

PROJECT DESCRIPTION:

Whitten Oval Indoor Training Facility is an example of modern architectural materials incorporated into a high-performance sporting facility. A fully enclosed 50m x 35m building with a tensile membrane roof, rarity in Australia, the facility sets new standards for design innovation and functionality.

The multi-purpose indoor training facility, with its high-translucency PTFE fabric roof allows natural daylight into the indoor field, providing a lighting level much brighter than a traditional building with internal lights.

HighComm Large Whitten

New Sheltered area at Matakana School
New Sheltered area at Matakana School

PROJECT DESCRIPTION:

Matakana School aimed to enhance its usable exterior space by creating a sheltered area that could be utilized by staff and students throughout the year. The shelter was designed to provide protection from both the sun and rain, functioning as an external extension to the existing school hall. This canopy extension is part of the school’s ongoing efforts to improve facilities and support educational programs. The project is a key element of a broader strategy to upgrade the school's infrastructure, which also includes weatherproofing over 70% of the existing buildings. This initiative reflects the school's commitment to creating a supportive learning environment, ensuring that students have access to quality outdoor and indoor spaces for various activities.

Underside view of shade structures
Underside view of shade structures

 

ID NUMBER 

1861

ENTRY CATEGORY

1 - Small Structures

ENTRANT ROLE

Design / Engineer / Fabrication / Installation

PROJECT NAME:

North Melbourne Primary School Circles

APPLICATION:

School Shade Structures

PROJECT DESCRIPTION:

The North Melbourne Primary School has unveiled an innovative vertical campus that maximises limited outdoor space through elevated play areas and creative design elements. A standout feature of this campus is the three circular shade structures, each positioned at different levels, seamlessly connecting indoor and outdoor spaces.

These vibrant orange shade structures are composed of 11.5m diameter rolled steel circles, adorned with 66 printed PVC mesh panels each.

 

Award Small NMelb Circles

General interior view of the Sydney Football Stadium Roof
General interior view of the Sydney Football Stadium Roof

2024 LSAA Design Awards Entry #3865 Sydney Football Stadium Roof

ID NUMBER 

3865

ENTRY CATEGORY

3 Large Structures

ENTRANT ROLE

Design / Engineer / Fabrication / Installation

PROJECT NAME:

Sydney Football Stadium Roof

APPLICATION:

Tensile Membrane Stadium Roof

  

PROJECT DESCRIPTION:

The Sydney Football Stadium Roof, completed in 2022, has joined the growing list of major international iconic stadiums featuring lightweight tensile membrane roofing. Right from the start of the design phase, the project brief emphasised the integration of key stadium elements – the Stadium Domain, Seating Bowl, Façade, and Roof – into a cohesive architectural language.

The highly visible 26,000 square metre tensile membrane roof uses Chukoh Skytop FGT800 PTFE as the primary cladding element. The lightweight PTFE membrane provides exceptional durability and strength, ensuring a 50+ year lifespan with minimal maintenance.

Award Large Sydney Football

Looking up at the completed truss
Looking up at the completed truss

2024 LSAA Design Awards Entry - #5000 Narre Warren Metro Station- Cable Truss Ceiling Support

IDENTIFICATION NUMBER  5000
ENTRY CATEGORY (1-6)                    5 
ENTRANT ROLE                        Specialist D&C Subcontractor
PROJECT NAME:                       Narre Warren Metro Station- Cable Truss Ceiling Support 
APPLICATION OF PROJECT:    Cable Bow truss and secondary framing supporting ceiling and PID screen.

PROJECT DESCRIPTION: 

How 3 Tons of Steel & Cable Replaced 30 Tons of Structural Steel: A New Era in Sustainable Infrastructure

On March 28th, 2024, the newly reconstructed metro stop at Narre Warren station, a critical junction on Melbourne’s Pakenham Line, was officially opened to the public. This station, one of the busiest along the line, had long been plagued by a hazardous and congested rail-road crossing. The recent rebuild of Narre Warren Station, now elevated above the streets in a sleek skyline crossing, is a significant achievement in the city’s ambitious Level Crossing Removal initiative.

HighComm Special Narre Warren