DESIGN FABRICATION INSTALLATION BRIEF
The Kina building at Green School New Zealand was conceived as a groundbreaking educational facility, designed to embody sustainable and innovative principles. The client’s vision was for a building that would integrate biophilic design with neuroarchitecture, enhancing both cognitive function and emotional well-being. The challenge was to create a structure that not only supported Green School’s commitment to holistic education and environmental stewardship but also reflected a deep connection to nature.
In addressing the design brief, Fabric Structures focused on several key aspects. The project demanded the use of cutting-edge fabric materials that would contribute to both the aesthetic and functional goals of the building.
Entrant: Structurflex Ltd - Engineering Fabrication Installation
Location: Hamilton Lake Domain
Client: Hamilton City Council
Architect: 360 Architects
Struct. Eng.: Compusoft Engineering
Builder: Foster Construction
Fabricator: Structurflex
This project was entered in the LSAA 2009 Design Awards - Medium Structures (#2022)
No further details have been entered to date.
This project was entered in the LSAA 2016 Design Awards (Cat 2 Medium Structures, 2047)
Entrant: Fabric Structure Systems (Designer / Fabricator / Installer)
Location: Whangarei, New Zealand. Completed: April 2016
Client: Whangarei District Council
Team: Wade Design Engineers Ltd, Fabric Structure Systems, Culum Engineering (Steel)
Application
To enhance the CBD environment and aid in the rejuvenation of the central business district to encourage the return of pedestrian traffic therefore enhancing the shopping experience.
Description
A local council initiative to revitalise the existing town center mall. The new canopy to be an integral feature of the ‘ shared space’ pedestrianizing of the dated 40 year old mall.
APPLICATION OF PROJECT: 3 Pod like classrooms at Green School NZ
PROJECT DESCRIPTION:
To provide an outer skin from a material that can be recycled if/when replaced and also blends into environment. Wastage of non-recyclable materials to be kept to a minimum.
Also to provide the support frame to take the PVC membrane.
DESIGN / FABRICATION / INSTALLATION BRIEF
It was requested by the architect that we would supply a membrane solution for three-pod like classrooms for Green School New Zealand, to function as an aesthetic cladding and to create a ventilated thermal barrier to reduce a “heat soak effect” into the building. This was to complement the “green” label for the structure, reducing running costs and adding an organic look.

APPLICATION OF PROJECT
Outdoor concert theatre at Jacobs Park
The Rady Shell Concert Venue Description
The Rady Shell in San Diego Symphony’s new bay side venue is the first permanent year-round bay side concert venue in the nation operated by the Symphony Orchestra. The Rady Shell can accommodate audiences of 3,500 – 8,000 per concert and up to 10,000 for special events.
Fabritecture was engaged for the technical design and fabrication of the Rady Shell performance structure and surrounding pavilion structures. The Shell itself comprises a rolled steel frame and PTFE cladding. The entire structure is approximately 236,000lbs (107,000kgs or 107 tonnes).
The stage accommodates an orchestra size of up to 150 musicians and choir with a front of stage width of 32m and depth of 20m.

APPLICATION OF PROJECT:
ETFE 600 sqm Skylight over an indoor swimming pool
PROJECT DESCRIPTION:The Shore Physical Education Centre (SPEC) was built to deliver a suite of new flexible learning spaces including a multi-purpose sports complex and an indoor swimming pool. The 16 pillow, 3-layer ETFE skylights were a key part of the indoor swimming pool roof, designed to fill the indoor aquatic centre with natural lighting, while also providing a modern, highly aesthetic architectural feature to the roof.
Sydney Aquarium Dugong's at Mermaid Lagoon
This Project was entered into the LSAA 2009 Design Awards (29047)Entrant: UFS Australasia Pty Ltd - Designer / Fabricator
Location: Sydney Aquarium - Darling Harbour Sydney
Client: Sydney Attractions Group
Struct. Eng.: Wade Consulting
Builder: Universal Fabric Structures / Ozrig
Fabricator: Fabric Shelter Systems
No further details have been entered.
Signature Structure at the Ocean Supercenter Shopping Mall
Entrant: GeoMetal Limited (Design & Engineering) - LSAA Design Awards 2016 (Cat 2, Medium Structures #72)
Location: Ocean Supercenter, Myanmar, Thailand. Completed: January 2016. Client: Capital Properties
Team: Process Architect & Planner Co., Ltd., Fastech Company Limited
Application: Signature Structure at a shopping Mall
Description: The shopping mall is one of first projects to use a tensile fabric structure in Myanmar. It was a pleasure for Geometal to design and install for this project. Client’s enquiries Geometal team to create a significant landmark at main entrance of the shopping mall.
Jakarta Australian Embassy ETFE Canopy
Entrant: Fabritecture (Designer and Installer)
Location: Jakarta, Indonesia. Completed: June 2015 Client: Leightons Asia
Team: Denton Corker Marshall, Maffeis Engineering, Fabritecture, Seele Covertex
Application: ‘Floating’ canopy suspended over a courtyard using a 2-layer ETFE cushion system, supported exclusively by stainless steel tie rods
This project was entered in the LSAA 2016 Design Awards (Medium Fabric Structures, 8128)
- M6 Community Recreational Facility, Rockdale, NSW (DA 2022 Entry)
- Pacific Fair Porte Cochere
- Halo Night Club Brisbane
- 2374 Green School Pods - New Plymouth, NZ
- Yas Island - Gateway Park
- CityCentre Automated People Mover
- Blacktown Village Green
- Mildura Riverfront Performance Venue
- Catholic College Bendigo
- Penguin Parade Phillip Island
- Medium Structures - 2024DA - MSU John Goodman Amphitheatre
- Jakarta Mosque - Membrane Covered Outdoor Area
- Point Boston Peninsular Club
- Abilene Airport Tension Membrane Structure Entrance
- Medium Structures - 2024DA -Tumbalong Green Amphitheatre
Page 3 of 5